(1) Given:
Total bundles = $7 \frac{1}{2} = \frac{15}{2}$
Length per bundle = $202 \frac{4}{5} = \frac{1014}{5}$ m
Total length of the cable purchased = (Total bundles) x (Length per bundle)
Substituting the values in above, we get:
Total length of the cable purchased = $\frac{15}{2}$ x $\frac{1014}{5}$ m
= $\frac{3}{2}$ x $\frac{1014}{1}$ m
= $\frac{3}{1}$ x $\frac{507}{1}$ m
= 1521 m
Hence, option 2 is the correct option.
(2) The cost of cable per meter = ₹$6\frac{2}{3} = ₹\frac{20}{3}$ $\hspace{2cm}$
Given
Total length of the cable = 1521 m $\hspace{2.5cm}$ [From previous step]
The amount paid by Amar = (Cost of cable per meter) x (Total length of the cable)
Substituting the values in above, we get:
The amount paid by Amar = ₹$\frac{20}{3}$ x 1521 m
= ₹20 x 507
= ₹10140
Hence, option 3 is the correct option.
(3) Given:
Bundles of cable used for the top floor = $2\frac{1}{2} = \frac{5}{2}$
Length per bundle = $\frac{1014}{5}$ m
Length of cable used for the top floor = (Bundles of cable used for the top floor) x (Length per bundle)
Substituting the values in above, we get:
Length of cable used for the top floor = $\frac{5}{2}$ x $\frac{1014}{5}$ m = 507 m
Hence, option 2 is the correct option.
(4) Given:
Length of one bundle = $\frac{1014}{5}$ m
Cut length = $13\frac{4}{5}$ m = $\frac{69}{5}$ m
Remaining length = (Length of one bundle - Cut length)
Substituting the values in above, we get:
Remaining length = $\Big(\frac{1014}{5} - \frac{69}{5}\Big)$ m
= $\frac{1014 - 69}{5}$ m = $\frac{945}{5}$ m = 189 m
Number of pieces of 21 m length = Remaining length ÷ 21
Substituting the values in above, we get:
Number of pieces of 21 m length = 189 m ÷ 21 = $\frac{189}{21}$
= 9
Hence, option 1 is the correct option.