1(v)
In the block diagram of a robotic control system, the correct sequence is:
- (a)Input → Robot → Controller → Feedback
- (b)Feedback → Input → Controller → Robot
- (c)Input → Controller → Robot → Feedback
- (d)Controller → Input → Robot → Feedback
Show SolutionHide Solution↓
Input → Controller → Robot → Feedback
Reason — In a robotic control system, the input is first given to the controller, which processes the data and sends commands to the robot. The robot then performs the required action, and feedback is generated to monitor and adjust the system. Hence, the correct sequence is Input → Controller → Robot → Feedback.